Return to Previous Page

OPERATIONS MANAGEMENT

OPERATIONS MANAGEMENT

Set Descending Direction

Page:
  1. 1
  2. 2
  3. 3
  4. 4
  1. Assembly Line Balancing at Overland Tourister

    AUTHOR(S) : R. Muthukumar and Dr. Nagendra V. Chowdary
    PUBLISHED DATE: 13/09/2014
    PUBLISHER: ET Cases
    CATEGORY: OPERATIONS MANAGEMENT
    PRODUCT: CASELET
    CASE ID: OM-2-0006, OM-2-0006A
    CASE LENGTH: 1 page
    DESCRIPTION:

    This caselet facilitates understanding the concept and importance of Assembly Line Balancing with the backdrop of a Chennai-based shoe manufacturer, Overland Tourister (Overland). With its promotional activities, Overland bagged a plum deal for 60,000 running shoes. Rajesh Pillai (Rajesh), Founder, was apprehensive if the company would be able to manage bulk orders without any hiccups. Can Assembly Line Balancing ensure smooth operations at Overland?

    Pedagogical Objectives To understand ...
    read more
    SHOW DETAILS
  2. Keshav Motors: Process Analysis

    AUTHOR(S) : R. Muthukumar and Dr. Nagendra V. Chowdary
    PUBLISHED DATE: 13/09/2014
    PUBLISHER: ET Cases
    CATEGORY: OPERATIONS MANAGEMENT
    PRODUCT: CASELET
    CASE ID: OM-2-0005, OM-2-0005A
    CASE LENGTH: 1 page
    DESCRIPTION:

    Keshav Motors is a Bangalore-based manufacturer of electric bikes established by S. Keshav (Keshav) in 2013. In order to identify the bottleneck in the assembly process activity, Keshav decided to analyze the process design aspects with the help of assembly chart and flow diagram. This caselet can be used in Operations Management course and enables to analyze a process.
    Pedagogical Objectives

    This case study helps students to understand: Process analysis using Process Chart Measuring ...
    read more
    SHOW DETAILS
Set Descending Direction

Page:
  1. 1
  2. 2
  3. 3
  4. 4